Week 63 (24 October 2016)

 

Setout and establishment of pathways around the Chapel and Bishops House / Convent is still ongoing.

 

The 6x pinnacles have returned to site and have now been reinstated on the Bell Tower and the Nave's western facade.

 

The Chapels lawn area has had the irrigation and new turf laid, along with the proposed plantings on the levee bank.

 

Inside the Chapel the floor has had its final sand and coat applied.

 

Acoustic ceiling panels have arrived and have been installed, in preparation for the new light fittings and ceiling fans to be fitted.

 

New carpet around the altar and aisle runner will be installed early next week.

 