Gallery: Progress at week 62

Week 62 (17 October 2016)

 

Setout and establishment of pathways around the Chapel and Bishops House / Convent is still ongoing.

 

Central pathway which connects the circular staircase to the Chapels side doors has been formed and poured.

 

Inside the Chapel the floor is in the process of sanding and coating. This is a process over several stages.

 

Bishops House front yard has had the plants installed and new turf laid.

 

The steps which lead up to the Chapel from Cathedral Street, have now been formed and poured.

 